RESUME Data Lelang e-Proc

DATA LELANG TAHUN 2011

REKAPITULASI LAPORAN PENGADAAN BARANG/JASA KABUPATEN LOMBOK TENGAH

Kondisi sampai dengan tanggal 26 Apr 2017











TABEL REKAPITULASI HASIL LELANG PER TAHUN
MELALUI LPSE KABUPATEN LOMBOK TENGAH TAHUN 2011 - 2017

No.
Tahun
Paket (Paket)
Paket Selesai (Paket)
Pagu (Rp.)
Pagu Selesai (Rp.)
Nilai Penawaran Terkoreksi (Rp.)
Selisih (Rp.)
Prosentase (%)
1
2017
31
7
121.427.887.150
1.192.769.600
916.145.100
276.624.500
0,23
2
2016
120
120
303.657.698.580
303.657.698.580
276.726.479.935
26.931.218.645
8,87
3
2015
131
131
131.388.986.753
131.388.986.753
114.752.600.122
16.636.386.631
12,66
4
2014
90
90
88.644.120.024
88.644.120.024
77.549.603.654
11.094.516.370
12,52
5
2013
101
101
238.811.336.361
238.811.336.361
226.939.604.150
11.871.732.211
4,97
6
2012
180
176
298.813.635.624
296.243.040.624
272.346.210.900
24.136.828.724
8,07
7
2011
20
20
16.819.638.898
16.819.638.898
15.997.605.700
822.033.198
4,89
JUMLAH
673
645
1.199.563.303.390
1.076.757.590.840
985.228.249.561
91.769.340.279
7,65

JUMLAH LELANG PER-BULAN TAHUN 2017

No. BULAN PAGU DANA
(Rp.)
HPS
(Rp.)
PAKET LELANG SELESAI
(Paket)
PAKET LELANG
DALAM PROSES
(Paket)
TOTAL PAKET LELANG
(Paket)
1
Sedang Proses
120.235.117.550
119.927.152.910
0
24
24
2
04-Apr
1.192.769.600
1.169.701.000
7
0
7
JUMLAH
121.427.887.150
121.096.853.910
7
24
31

JUMLAH LELANG BERDASARKAN KATEGORI TAHUN 2017

No.
KATEGORI LELANG
PAGU DANA (Rp.)
PAKET LELANG SELESAI
(Paket)
PAKET LELANG DALAM PROSES
(Paket)
TOTAL PAKET LELANG
(Paket)
1
Pekerjaan Konstruksi
117.346.123.000
0
19
19
2
Jasa Konsultasi
2.574.132.150
7
3
10
3
Pengadaan Barang
1.507.632.000
0
2
2
JUMLAH
121.427.887.150
7
24
31

JUMLAH LELANG BERDASARKAN METODE PEMILIHAN TAHUN 2017

No.
KATEGORI LELANG
PAGU DANA (Rp.)
PAKET LELANG SELESAI
(Paket)
PAKET LELANG DALAM PROSES
(Paket)
TOTAL PAKET LELANG
(Paket)
1
e-Lelang Umum
113.371.720.000
0
12
12
2
e-Lelang Pemilihan Langsung
3.974.403.000
0
7
7
3
e-Seleksi Sederhana
1.134.362.550
6
1
7
4
e-Seleksi Umum
1.439.769.600
1
2
3
5
e-Lelang Sederhana
1.507.632.000
0
2
2
JUMLAH
121.427.887.150
7
24
31

TABEL REKAPITULASI DATA LELANG PER SKPD TAHUN 2017

No NAMA SKPD PAGU DANA
(Rp.)
HPS
(Rp.)
SELISIH LELANG
(Rp.)
PROSENTASE
(%)
JUMLAH PAKET
(Paket)
1
DIKES
225.362.550
199.727.000
0
0,00
1
2
DIPERTA
1.507.632.000
1.504.764.360
0
0,00
2
3
DPU-PR
109.580.403.000
109.280.149.550
515.656.000
0,17
24
4
DISDIK
113.000.000
113.000.000
69.900.600
38,14
1
5
DISPARBUD
96.000.000
94.457.000
59.900.500
37,60
1
6
RSUD
9.905.489.600
9.904.756.000
270.688.000
0,13
2
JUMLAH
121.427.887.150
121.096.853.910
916.145.100
0,23
31

DAFTAR PAKET LELANG TAHUN 2011

No NAMA PENYEDIA NPWP PAGU DANA
(Rp.)
HPS
(Rp.)
HARGA PENAWARAN
TERKOREKSI
(Rp.)
SUMBER
DANA
NAMA PAKET LELANG SKPD
1 CV. DANASADY Consultant
01.884.094.2-914.000
283.769.600
283.100.000
270.688.000
APBD
Pengawasan Pembangunan Ruang Poliklinik tahap II RSUD
2 CV. CITRA ADI DAYA CONSULTAN
02.295.005.9-911.000
175.000.000
169.786.000
150.000.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket IV DPU-PR
3 CV. GEO DaSE Consultant
03.004.305.3-915.000
175.000.000
169.786.000
135.080.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket I DPU-PR
4 CV. ARCHI TEKNIK
01.226.068.3-911.000
175.000.000
169.786.000
125.576.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket II DPU-PR
5 CV. WANDA Konsultan
02.924.508.1-915.000
175.000.000
169.786.000
105.000.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket III DPU-PR
6 CV. ASRID BINA UTAMA
01.884.093.4-911.000
113.000.000
113.000.000
69.900.600
APBD
Perencanaan pembangunan gedung DISDIK
7 CV. ASRID BINA UTAMA
01.884.093.4-911.000
96.000.000
94.457.000
59.900.500
APBD
Biaya Jasa Perencanaan untuk selong belanak, Mawun, Mawi dan Are Guling DISPARBUD